赵亚萍,博士生导师、永利集团荔园优青、新锐研究生导师,博士毕业于北京大学。已经在European Journal of Operational Research、International Journal of Production Research、IEEE Transactions on Automatic Control、IEEE Transactions on Automation Science and Engineering、International Journal of Production Research等期刊发表多篇学术论文,主持有国家自然科学基金、教育部文社科基金、广东省自然科学基金等多个国家级/省部级科研项目,多次担任European Journal of Operational
Research、Annals of Operations Research、IEEE Transactions on Automation Science and Engineering、Computers & Industrial Engineering等期刊匿名审稿人。获得广东省物流与供应链学会科学技术奖、广东省本科高校物流管理与工程类专业优秀教学成果一等奖、Wiley开放科学高贡献作者奖、中国运筹学会排序分会学术交流年会最佳会议论文奖等奖项。
2013.9-2018.7 北京大学工学院,管理学博士学位
2009.9-2013.7 南昌大学经济与管理学院,管理学学士学位
2024.3-至今 永利集团,澳门永利集团官方入口官网,副教授
2021.1~2023.12 永利集团,澳门永利集团官方入口官网,特聘副研究员
2018.9~2024.2 永利集团,澳门永利集团官方入口官网,助理教授
论文:
1. Zhao Y, Chen Q, Mo X, Xu X*. Data-driven optimization for energy-constrained dietary supplement scheduling: a bounded cut MP-DQN approach[J]. Computers & Industrial Engineering, 2024, 188:109894.
2. 任晓欣,莫翔志,陈庆粤,赵亚萍*.买方直接融资模式下的采购合约策略研究[J].系统管理学报, 2024:1-29, 网络首发, http://kns.cnki.net/kcms/detail/31.1977.n.20240108.1846.005.html.
3. Zhao Y, Huang J*, Xu E, Wang J, Xu X. A data-driven scheduling approach for integrated electricity-hydrogen system based on improved DDPG[J]. IET Renewable Power Generation, 2024, 18(3): 442-455.
4. Zhao Y, Luo H, Chen Q, Xu X*, Optimizing pricing and inventory strategies for dietary supplement production under stochastic demand, Industrial Management & Data Systems,2023, 2013-2037.
5. 赵亚萍,莫翔志,牛奔*.峰值能耗下随机订单的模型预测控制[J].信息与控制, 2023, 52(4): 551-560.
6. Zhao Y, Huang W, Xu E, Xu X, Pricing and green promotion decisions in a retailer-owned dual-channel supply chain with multiple manufacturers, Cleaner Logistics and Supply Chain, 2023 ,6:100092.
7. Zhao Y, Kong X, Xu X*, Xu E. Resource-controlled stochastic customer order scheduling via particle swarm optimization with bound information[J], Industrial Management & Data Systems, 2022 ,122(8):1882-1908.
8. Zhao Y, Xu X*, Xu E, Ben N. Stochastic Customer Order Scheduling on Heterogeneous Parallel Machines with Resource Allocation Consideration[J]. Computers & Industrial Engineering, 2021: 107539.
9. Wu L, Zhao Y*, Feng Y, et al. Minimizing makespan of stochastic customer orders in cellular manufacturing systems with parallel machines[J]. Computers & Operations Research, 2021, 1-16.
10. Li H, Li Z, Zhao Y, Xu X*. Scheduling customer orders on unrelated parallel machines to minimize total weighted completion time[J]. Journal of the Operational Research Society, 2021,72(8): 1726-1736.
11. Li H, Xu X*, Zhao Y*. Efficient simulation budget allocation with bound information[J]. IEEE Transactions on Automatic Control. 2019,65(1), 207 - 222.
12. Zhao Y, Xu X*, Li H. Inventory-constrained throughput optimization for stochastic customer orders[J]. IEEE Transactions on Automation Science and Engineering, 2018, 16(3), 1218-1231.
13. Zhao Y, Xu X*, Li H. Minimizing expected cycle time of stochastic customer orders through bounded multi-fidelity simulations[J]. IEEE Transactions on Automation Science and Engineering, 2018, 15(4): 1794-1809.
14. Zhao Y, Xu X*, Li H. Throughputs maximization of stochastic customer orders under two production schemes[J]. IEEE Transactions on Automation Science and Engineering, 2017, 14(2): 745-757.
15. Zhao Y, Xu X*, Li H, Liu Y. Stochastic customer order scheduling with setup times to minimize expected cycle time[J]. International Journal of Production Research, 2017, 56(7): 2684-2706.
16. Zhao Y, Xu X, Li H, et al. Prioritized customer order scheduling to maximize throughput[J]. European Journal of Operational Research, 2016, 255(2): 345-356.
17. Xu X*, Zhao Y, Wu M, et al. Stochastic customer order scheduling to minimize long-run expected order cycle time[J]. Annals of Operations Research, 2016, 1-24.
18. Xu X*, Ma Y, Zhou Z, Zhao Y. Customer order scheduling on unrelated parallel machines to minimize total completion time[J]. IEEE Transactions on Automation Science and Engineering, 2015, 12(1): 244-257.
19. Xu X*, Zhao Y, Li H, et al. Stochastic customer order scheduling using simulation-based genetic algorithm[C]. In 2015 Winter Simulation Conference (WSC), 2015: 2317-2328.
20. Xu X*, Zhao Y, Li H, Liu Y. Stochastic customer order scheduling to maximize throughput[C]. In 2015 IEEE International Conference on Automation Science and Engineering (CASE). IEEE, 2015: 665-670.
21. Zhao Y, Xu X*, Li H. Effective throughput maximization of stochastic customer orders with inventory constraints[C]. In 2016 IEEE International Conference on Automation Science and Engineering (CASE). IEEE, 2016: 1387-1393.
22. Zhao Y, Xu X*, Li H. Maximizing the long-run average expected profit of a periodic-review assemble-to-order system [C]. In 2017 IEEE International Conference on Automation Science and Engineering (CASE). IEEE, 2017: 674-679.
23. Li H, Xu X*, Zhao Y. Customer order scheduling on unrelated parallel machines to minimize total weighted completion time[C]. In 2017 Multidisciplinary International Conference on Scheduling: Theory and Applications (MISTA), 2017: 1-17.
24. Xu L, Huang W, Zhao Y*, Mo X, Jin R. High-speed railway meal delivery service: a stochastic scheduling perspective[J]. TRB Annual Meeting, 2023.
25. 赵亚萍. 异质并行机环境下随机客户订单优化问题研究(Research on the Optimization of Stochastic Customer Orders in Heterogeneous Parallel Machine Environment). 北京:《中国学术期刊(光盘版)》电子杂志社有限公司,2020.3. ISBN 978-7-83014-030-4.
项目:
1. 国家自然科学基金青年项目,资源配置支持下的随机客户订单动态调度问题研究(72001145),2021-01至2023-12,结题,主持.
2. 教育部人文社会科学青年基金项目,基于多种产品的零售商混合渠道供应链竞争与协同问题研究(20YJC630226),2020-01至2022-12,结题,主持.
3. 广东省自然科学基金面上基金项目,基于高级智能排产模型的营养保健品订单调度优化问题研究(2022A1515011235),2022-01至2024-12,在研,主持.
4. 深圳市稳定支持计划面上项目,“水-电-粮”纽带系统极端事件影响下的韧性提升问题研究(20231121092753001),2023-12至2025-11,在研,主持.
5. 广东省物流与供应链学会研究课题, 随机供电受限下的营养保健品生产调度优化研究(2023LS007C),2023-09至2024-08,在研,主持.
6. 教育部产学合作协同育人项目,智慧物流背景下基于实践能力的《物流学概论》课程优化设(9aab9924-c50e-4253-8f00-5f3bdebedb57),2021-03至2022-02,结题,主持.
7. 广东省高等公司产品研究和改革项目,基于智能优化算法的随机客户订单调度问题研究(2019071),2022-01至2024-12,在研,主持.